Nieuws
No-dig Award Scandinavia
Waste water company Gribvand/Spildevand - Engineering firm COWI and Main Contractor Smet-Tunnelling have won the No-Dig Award Scandinavia. The microtunnelling project Helsinge (longest pipe jacking) was awarded.
Project description Helsinge
No-Dig project 2012
Client: Gribvand/Spildevand
Engineering firm: COWI
Location: Helsinge-Denmark
Tunneldiam. : 2500x3000mm
Tunnel length: 1100m
Tunnel depth: 12 to 15 m
Geology: Moraine clay with boulders
Intersection of different houses
Execution period: July - September 2012
King opens Diabolo
King Albert II officially opened the Diabolo railway tunnel. The 3 Companies Smet-GWT, Smet-Tunnelling and Smet-F&C participated in this project. The opening has been elaborated in the press.
2012-06-08 Koning opent Diabolo-spoortunnel (Het Laatste Nieuws)
2012-06-08 In sneltreinvaart naar de luchthaven (GvA)
2012-06-08 Luchthaven beter bereikbaar via spoor (Het Nieuwsblad)