For Pidpa’s new water production center in Oud-Turnhout, we implemented four structural engineering solutions. These include the wells, (return) dewatering, pile foundations, and the complete electromechanical equipment.

  • Client: Pidpa
  • Period: 2021–2025
  • Location: Oud-Turnhout, Antwerp
  • Solution: Electromechanics – Dewatering – Vertical Drilling – Foundations

Behind the Scenes

A Sustainable Approach to the Project

  • SDG 6 – The water treatment plant operates entirely without chlorine. From now on, the water will be treated using a biological iron removal process, which significantly reduces the use of chemicals. This ensures that people have access to clean, drinkable water.